1 | horizontal directional drilling hdd | | | | | | | 2 | 0.31% |
2 | texas directionalboring your pipe | | | | | | | 2 | 0.31% |
3 | directionalx marks the boring | | | | | | | 2 | 0.31% |
4 | texas directionalx marks the | | | | | | | 2 | 0.31% |
5 | directionalboring your pipe here | | | | | | | 2 | 0.31% |
6 | marks the boring spot | | | | | | | 2 | 0.31% |
7 | texas directionalyes call texasdirectionalcom | | | | | | | 2 | 0.31% |
8 | business or morning drive | | | | | | | 1 | 0.16% |
9 | their home business or | | | | | | | 1 | 0.16% |
10 | home business or morning | | | | | | | 1 | 0.16% |
11 | boring zone is usually | | | | | | | 1 | 0.16% |
12 | directional boring zone is | | | | | | | 1 | 0.16% |
13 | a directional boring zone | | | | | | | 1 | 0.16% |
14 | for a directional boring | | | | | | | 1 | 0.16% |
15 | footprint for a directional | | | | | | 1 | 0.16% |
16 | or morning drive to | | | | | | | 1 | 0.16% |
17 | morning drive to be | | | | | | | 1 | 0.16% |
18 | the footprint for a | | | | | | 1 | 0.16% |
19 | construction the footprint for | | | | | | 1 | 0.16% |
20 | sewer to install in | | | | | | | 1 | 0.16% |
21 | install in a heavily | | | | | | | 1 | 0.16% |
22 | in a heavily congested | | | | | | | 1 | 0.16% |
23 | be affected by utility | | | | | | | 1 | 0.16% |
24 | to be affected by | | | | | | | 1 | 0.16% |
25 | drive to be affected | | | | | | | 1 | 0.16% |
26 | to install in a | | | | | | | 1 | 0.16% |
27 | storm sewer to install | | | | | | | 1 | 0.16% |
28 | disturbance to surroundingsno one | | | | | | | 1 | 0.16% |
29 | an existing right of | | | | | | | 1 | 0.16% |
30 | require little digging the | | | | | | | 1 | 0.16% |
31 | methods require little digging | | | | | | | 1 | 0.16% |
32 | boring methods require little | | | | | | | 1 | 0.16% |
33 | have a residential water | | | | | | | 1 | 0.16% |
34 | a residential water line | | | | | | | 1 | 0.16% |
35 | residential water line a | | | | | | | 1 | 0.16% |
36 | decreases rehabilitation timebecause directional | | | | | | | 1 | 0.16% |
37 | boring decreases rehabilitation timebecause | | | | | | | 1 | 0.16% |
38 | directional boring decreases rehabilitation | | | | | | | 1 | 0.16% |
39 | existing right of way | | | | | | | 1 | 0.16% |
40 | river crossing or a | | | | | | | 1 | 0.16% |