1 | average measuring speed multipart | | | | | | | 3 | 0.29% |
2 | range 10°c35°c 50°f95°f system | | | | | | | 3 | 0.29% |
3 | per part xy accuracy | | | | | | | 2 | 0.19% |
4 | france morocco tunisia algeria | | | | | | | 2 | 0.19% |
5 | 5sec per part xy | | | | | | | 2 | 0.19% |
6 | geometric dimensions and tolerances | | | | | | | 2 | 0.19% |
7 | measurement and inspection of | | | | | | | 2 | 0.19% |
8 | x 20 footprint wxd | | | | | | 2 | 0.19% |
9 | 15sec per part xy | | | | | | | 2 | 0.19% |
10 | membrane electrode assemblies meas | | | | | | | 2 | 0.19% |
11 | finland estonia latvia lithuania | | | | | | | 2 | 0.19% |
12 | e23025l1000μm maximal part weight | | | | | | | 2 | 0.19% |
13 | maximal part weight 5 | | | | | | | 2 | 0.19% |
14 | part weight 5 kg | | | | | | | 2 | 0.19% |
15 | weight 5 kg 11 | | | | | | | 2 | 0.19% |
16 | temperature range 10°c35°c 50°f95°f | | | | | | | 2 | 0.19% |
17 | 10°c35°c 50°f95°f system dimensions | | | | | | | 2 | 0.19% |
18 | norway finland estonia latvia | | | | | | | 2 | 0.19% |
19 | 50°f95°f system dimensions wxdxh | | | | | | | 2 | 0.19% |
20 | 400mm x 600mm 16 | | | | | | | 2 | 0.19% |
21 | specifications maximal measuring area | | | | | | | 2 | 0.19% |
22 | x 600mm 16 x | | | | | | | 2 | 0.19% |
23 | 600mm 16 x 24 | | | | | | | 2 | 0.19% |
24 | on a local server | | | | | | | 2 | 0.19% |
25 | measuring devices constructed features | | | | | | | 1 | 0.10% |
26 | information and reporting systems | | | | | | | 1 | 0.10% |
27 | systems openstandard data input | | | | | | | 1 | 0.10% |
28 | reporting systems openstandard data | | | | | | | 1 | 0.10% |
29 | day setup and user | | | | | | | 1 | 0.10% |
30 | and reporting systems openstandard | | | | | | | 1 | 0.10% |
31 | training for fast implementation | | | | | | | 1 | 0.10% |
32 | for fast implementation measurement | | | | | | | 1 | 0.10% |
33 | for integration with other | | | | | | | 1 | 0.10% |
34 | output for integration with | | | | | | | 1 | 0.10% |
35 | data output for integration | | | | | | | 1 | 0.10% |
36 | fast implementation measurement data | | | | | | | 1 | 0.10% |
37 | implementation measurement data center | | | | | | | 1 | 0.10% |
38 | measurement data center for | | | | | | | 1 | 0.10% |
39 | statistics results analyses and | | | | | | | 1 | 0.10% |
40 | 3 day setup and | | | | | | | 1 | 0.10% |