1 | gas and energy sector | | | | | | | 2 | 0.49% |
2 | crane inspection fall arrest | | | | | | | 2 | 0.49% |
3 | inspection drops inspection campaign | | | | | | | 2 | 0.49% |
4 | drops inspection campaign dolly | | | | | | | 2 | 0.49% |
5 | inspection campaign dolly track | | | | | | | 2 | 0.49% |
6 | dolly track inspection and | | | | | | | 2 | 0.49% |
7 | inspection repair and load | | | | | | | 2 | 0.49% |
8 | alignment engineering and project | | | | | | | 2 | 0.49% |
9 | engineering and project management | | | | | | | 2 | 0.49% |
10 | and project management critical | | | | | | | 2 | 0.49% |
11 | project management critical rigging | | | | | | | 2 | 0.49% |
12 | management critical rigging projects | | | | | | | 2 | 0.49% |
13 | inspection fall arrest system | | | | | | | 2 | 0.49% |
14 | rope access derrick and | | | | | | | 2 | 0.49% |
15 | fall arrest system inspection | | | | | | | 2 | 0.49% |
16 | arrest system inspection ndt | | | | | | | 2 | 0.49% |
17 | system inspection ndt inspections | | | | | | | 2 | 0.49% |
18 | offshore regulations adequacy bhatubular | | | | | | | 2 | 0.49% |
19 | brazilian offshore regulations adequacy | | | | | | | 2 | 0.49% |
20 | gear inspection lolernbr´s drilling | | | | | | | 2 | 0.49% |
21 | thickness measurement inspection lifesaving | | | | | | | 2 | 0.49% |
22 | piping thickness measurement inspection | | | | | | | 2 | 0.49% |
23 | handling tools api8b sps | | | | | | | 2 | 0.49% |
24 | tools api8b sps hull | | | | | | | 2 | 0.49% |
25 | bolt inspection drops inspection | | | | | | | 2 | 0.49% |
26 | campaign dolly track inspection | | | | | | | 2 | 0.49% |
27 | using rope access derrick | | | | | | | 2 | 0.49% |
28 | 55 21 34374645 comercialqualitechirmcom | | | | | | | 2 | 0.49% |
29 | inspection repair and maintenance | | | | | | | 2 | 0.49% |
30 | company operating in the | | | | | | | 2 | 0.49% |
31 | operating in the oil | | | | | | | 2 | 0.49% |
32 | in the oil gas | | | | | | | 2 | 0.49% |
33 | the oil gas and | | | | | | | 2 | 0.49% |
34 | oil gas and energy | | | | | | | 2 | 0.49% |
35 | drilling equipment overhaul maintenance | | | | | | | 2 | 0.49% |
36 | maintenance using rope access | | | | | | | 2 | 0.49% |
37 | overhaul maintenance using rope | | | | | | | 2 | 0.49% |
38 | equipment overhaul maintenance using | | | | | | | 2 | 0.49% |
39 | repair and maintenance services | | | | | | | 1 | 0.25% |
40 | inspection ndt inspections lifting | | | | | | | 1 | 0.25% |