1 | engineered products sales and | | | | | | | 4 | 0.87% |
2 | products sales and services | | | | | | | 4 | 0.87% |
3 | now an authorised distributor | | | | | | | 2 | 0.44% |
4 | project executionmanagement electrical motor | | | | | | | 2 | 0.44% |
5 | executionmanagement electrical motor services | | | | | | | 2 | 0.44% |
6 | light construction equipment doosan | | | | | | | 2 | 0.44% |
7 | sales and services medical | | | | | | | 2 | 0.44% |
8 | construction equipment doosan portable | | | | | | | 2 | 0.44% |
9 | equipment doosan portable power | | | | | | | 2 | 0.44% |
10 | laser scanning cmm inspection | | | | | | | 2 | 0.44% |
11 | distribution rental climate controlled | | | | | | | 2 | 0.44% |
12 | 3d laser scanning cmm | | | | | | | 2 | 0.44% |
13 | milling 3d laser scanning | | | | | | | 2 | 0.44% |
14 | storage 3d printing services | | | | | | | 2 | 0.44% |
15 | control storage 3d printing | | | | | | | 2 | 0.44% |
16 | climate control storage 3d | | | | | | | 2 | 0.44% |
17 | more than machining services | | | | | | | 2 | 0.44% |
18 | controlled storage of industrial | | | | | | | 2 | 0.44% |
19 | storage project executionmanagement electrical | | | | | | | 2 | 0.44% |
20 | specialist hvof metal spraying | | | | | | | 2 | 0.44% |
21 | manufacturing distribution rental climate | | | | | | | 2 | 0.44% |
22 | industrial manufacturing distribution rental | | | | | | | 2 | 0.44% |
23 | manufacturerepair of industrial spares | | | | | | | 2 | 0.44% |
24 | climate controlled storage of | | | | | | | 2 | 0.44% |
25 | over 5000 hp both | | | | | | | 1 | 0.22% |
26 | engineering design equipment and | | | | | | | 1 | 0.22% |
27 | kw rewinding of both | | | | | | | 1 | 0.22% |
28 | and support asset management | | | | | | | 1 | 0.22% |
29 | services and support asset | | | | | | | 1 | 0.22% |
30 | maintenance services and support | | | | | | | 1 | 0.22% |
31 | equipment and material supply | | | | | | | 1 | 0.22% |
32 | design equipment and material | | | | | | | 1 | 0.22% |
33 | rewinding of both acdc | | | | | | | 1 | 0.22% |
34 | to 2000 kw rewinding | | | | | | | 1 | 0.22% |
35 | of both acdc apparatus | | | | | | | 1 | 0.22% |
36 | both acdc apparatus motor | | | | | | | 1 | 0.22% |
37 | commissioning engineering design equipment | | | | | | | 1 | 0.22% |
38 | installation and construction startup | | | | | | | 1 | 0.22% |
39 | redesignupgrades dc brush replacementmaintenance | | | | | | | 1 | 0.22% |
40 | – installation and construction | | | | | | | 1 | 0.22% |