1 | as a result of | | | | | | | 6 | 0.61% |
2 | were put into operation | | | | | | | 4 | 0.41% |
3 | of oil and gas | | | | | | | 4 | 0.41% |
4 | the drilling and testing | | | | | | | 4 | 0.41% |
5 | of the drilling and | | | | | | | 4 | 0.41% |
6 | result of the drilling | | | | | | | 4 | 0.41% |
7 | a result of the | | | | | | | 4 | 0.41% |
8 | facilities were put into | | | | | | | 3 | 0.31% |
9 | and testing works of | | | | | | | 3 | 0.31% |
10 | drilling and testing works | | | | | | | 3 | 0.31% |
11 | from the producing horizon | | | | | | | 3 | 0.31% |
12 | construction facilities were put | | | | | | | 3 | 0.31% |
13 | capital construction facilities were | | | | | | | 3 | 0.31% |
14 | and testing of wells | | | | | | | 3 | 0.31% |
15 | drilling and testing of | | | | | | | 3 | 0.31% |
16 | development for the khairkeldy | | | | | | | 2 | 0.20% |
17 | infrastructure development for the | | | | | | | 2 | 0.20% |
18 | project infrastructure development for | | | | | | | 2 | 0.20% |
19 | objects on tf the | | | | | | | 2 | 0.20% |
20 | tf the system of | | | | | | | 2 | 0.20% |
21 | on tf the system | | | | | | | 2 | 0.20% |
22 | system of collecting gos | | | | | | | 2 | 0.20% |
23 | of collecting gos and | | | | | | | 2 | 0.20% |
24 | oil influx was received | | | | | | | 2 | 0.20% |
25 | influx was received from | | | | | | | 2 | 0.20% |
26 | was received from the | | | | | | | 2 | 0.20% |
27 | preliminary preparation of oil | | | | | | | 2 | 0.20% |
28 | for the khairkeldy group | | | | | | | 2 | 0.20% |
29 | of construction of the | | | | | | | 2 | 0.20% |
30 | the khairkeldy group of | | | | | | | 2 | 0.20% |
31 | a result of drilling | | | | | | | 2 | 0.20% |
32 | of drilling and testing | | | | | | | 2 | 0.20% |
33 | start of construction of | | | | | | | 2 | 0.20% |
34 | preparation of oil on | | | | | | | 2 | 0.20% |
35 | oil and gas of | | | | | | | 2 | 0.20% |
36 | potential of oil and | | | | | | | 2 | 0.20% |
37 | the potential of oil | | | | | | | 2 | 0.20% |
38 | identify the potential of | | | | | | | 2 | 0.20% |
39 | order to identify the | | | | | | | 2 | 0.20% |
40 | testing works of the | | | | | | | 2 | 0.20% |