1 | florida department of transportation | | | | | | | 3 | 0.60% |
2 | inspection florida department of | | | | | | | 2 | 0.40% |
3 | bridge inspection florida department | | | | | | | 2 | 0.40% |
4 | department of transportation d6 | | | | | | | 2 | 0.40% |
5 | department of transportation d4 | | | | | | | 2 | 0.40% |
6 | high mast light poles | | | | | | | 2 | 0.40% |
7 | disaster marlin has the | | | | | | | 1 | 0.20% |
8 | mobilize up to 10 | | | | | | | 1 | 0.20% |
9 | to mobilize up to | | | | | | | 1 | 0.20% |
10 | ability to mobilize up | | | | | | | 1 | 0.20% |
11 | the ability to mobilize | | | | | | | 1 | 0.20% |
12 | has the ability to | | | | | | | 1 | 0.20% |
13 | marlin has the ability | | | | | | | 1 | 0.20% |
14 | the event of a | | | | | | | 1 | 0.20% |
15 | natural disaster marlin has | | | | | | | 1 | 0.20% |
16 | in the event of | | | | | | | 1 | 0.20% |
17 | repair in the event | | | | | | | 1 | 0.20% |
18 | and repair in the | | | | | | | 1 | 0.20% |
19 | maintenance and repair in | | | | | | | 1 | 0.20% |
20 | and maintenance and repair | | | | | | | 1 | 0.20% |
21 | inspections and maintenance and | | | | | | | 1 | 0.20% |
22 | underwater inspections and maintenance | | | | | | | 1 | 0.20% |
23 | inspection and assessment to | | | | | | | 1 | 0.20% |
24 | bridge inspection and assessment | | | | | | | 1 | 0.20% |
25 | up to 10 different | | | | | | | 1 | 0.20% |
26 | toggle navigation marlin operationsmarlin | | | | | | | 1 | 0.20% |
27 | specialized teams for emergency | | | | | | | 1 | 0.20% |
28 | structural investigation fracture critical | | | | | | | 1 | 0.20% |
29 | inspections routine maintenance scour | | | | | | | 1 | 0.20% |
30 | sign inspections routine maintenance | | | | | | | 1 | 0.20% |
31 | overhead sign inspections routine | | | | | | | 1 | 0.20% |
32 | inspections overhead sign inspections | | | | | | | 1 | 0.20% |
33 | structure inspections mooring field | | | | | | | 1 | 0.20% |
34 | segmental structure inspections mooring | | | | | | | 1 | 0.20% |
35 | level segmental structure inspections | | | | | | | 1 | 0.20% |
36 | high level segmental structure | | | | | | | 1 | 0.20% |
37 | assessments high level segmental | | | | | | | 1 | 0.20% |
38 | forensic structural investigation fracture | | | | | | | 1 | 0.20% |
39 | and indepth bridge inspection | | | | | | | 1 | 0.20% |
40 | inspections forensic structural investigation | | | | | | | 1 | 0.20% |