1 | plug and abandonment tools | | | | | | | 4 | 0.30% |
2 | sentinelcem pro cement system | | | | | | | 3 | 0.22% |
3 | drilling and completion fluids | | | | | | | 3 | 0.22% |
4 | well control solutions view | | | | | | | 3 | 0.22% |
5 | cementing retainers and bridge | | | | | | | 3 | 0.22% |
6 | control solutions view all | | | | | | | 3 | 0.22% |
7 | cased hole logging slickline | | | | | | | 3 | 0.22% |
8 | retainers and bridge plugs | | | | | | | 3 | 0.22% |
9 | wireline cased hole logging | | | | | | | 3 | 0.22% |
10 | coiled tubing hydraulic work | | | | | | | 3 | 0.22% |
11 | solutions view all well | | | | | | | 2 | 0.15% |
12 | halliburton second quarter 2024 | | | | | | | 2 | 0.15% |
13 | rezconnect® well testing system | | | | | | | 2 | 0.15% |
14 | the future of energy | | | | | | | 2 | 0.15% |
15 | intervention software well control | | | | | | | 2 | 0.15% |
16 | software well control solutions | | | | | | | 2 | 0.15% |
17 | tools wellbore cleaning technology | | | | | | | 2 | 0.15% |
18 | modeling solution to be | | | | | | | 2 | 0.15% |
19 | solution to be used | | | | | | | 2 | 0.15% |
20 | and completion fluids drilling | | | | | | | 2 | 0.15% |
21 | construction digitally integrated well | | | | | | | 2 | 0.15% |
22 | drilling and logging platform | | | | | | | 2 | 0.15% |
23 | digitally integrated well construction | | | | | | | 2 | 0.15% |
24 | carbon solutions view all | | | | | | | 2 | 0.15% |
25 | low carbon solutions view | | | | | | | 2 | 0.15% |
26 | xtend® acid stimulation service | | | | | | | 2 | 0.15% |
27 | software decisionspace® 365 enterprise | | | | | | | 2 | 0.15% |
28 | halliburton and wintershall dea | | | | | | | 2 | 0.15% |
29 | to be used by | | | | | | | 2 | 0.15% |
30 | well intervention back well | | | | | | | 2 | 0.15% |
31 | unified ensemble modeling solution | | | | | | | 2 | 0.15% |
32 | flowback equipment pipe recovery | | | | | | | 2 | 0.15% |
33 | second quarter 2024 earnings | | | | | | | 2 | 0.15% |
34 | ensemble modeling solution to | | | | | | | 2 | 0.15% |
35 | coiled tubing hydraulic workover | | | | | | | 2 | 0.15% |
36 | quarter 2024 earnings conference | | | | | | | 2 | 0.15% |
37 | formation evaluation back formation | | | | | | | 2 | 0.15% |
38 | evaluation back formation evaluation | | | | | | | 2 | 0.15% |
39 | back formation evaluation surface | | | | | | | 2 | 0.15% |
40 | formation evaluation surface data | | | | | | | 2 | 0.15% |