Total words: 7104 | 2-word phrases: 1770 | 3-word phrases: 2221 | 4-word phrases: 2378
PAGE INFO
Title | Try to keep the title under 60 characters (4 characters) CTAC |
Description | Try to keep the meta description between 50 - 160 characters (125 characters) The Concrete Testing Adherence Program (CTAC) was developed to create fair and consistent assessment of ready mixed concrete. |
Keywords | Meta keywords are not recommended anymore (0 characters) |
H1 | No H1 tag on the page (0 characters) |
ONE WORD PHRASES 735 Words
# |
Keyword |
H1 |
Title |
Des |
Volume |
Position |
Suggest |
Frequency |
Density |
1 | the | | | | | | | 239 | 32.52% |
2 | of | | | | | | | 89 | 12.11% |
3 | and | | | | | | | 72 | 9.80% |
4 | be | | | | | | | 59 | 8.03% |
5 | to | | | | | | | 58 | 7.89% |
6 | a | | | | | | | 58 | 7.89% |
7 | concrete | | | | | | | 53 | 7.21% |
8 | shall | | | | | | | 39 | 5.31% |
9 | in | | | | | | | 38 | 5.17% |
10 | × | | | | | | | 35 | 4.76% |
TWO WORD PHRASES 1770 Words
# |
Keyword |
H1 |
Title |
Des |
Volume |
Position |
Suggest |
Frequency |
Density |
1 | of the | | | | | | | 38 | 2.15% |
2 | shall be | | | | | | | 35 | 1.98% |
3 | in a | | | | | | | 17 | 0.96% |
4 | in the | | | | | | | 14 | 0.79% |
5 | × astm | | | | | | | 14 | 0.79% |
6 | with a | | | | | | | 14 | 0.79% |
7 | the temperature | | | | | | | 13 | 0.73% |
8 | to the | | | | | | | 13 | 0.73% |
9 | from the | | | | | | | 12 | 0.68% |
10 | on a | | | | | | | 12 | 0.68% |
11 | with the | | | | | | | 12 | 0.68% |
12 | × csa | | | | | | | 11 | 0.62% |
13 | each layer | | | | | | | 10 | 0.56% |
14 | to be | | | | | | | 10 | 0.56% |
15 | and a | | | | | | | 10 | 0.56% |
16 | concrete test | | | | | | | 9 | 0.51% |
17 | mixed concrete | | | | | | | 9 | 0.51% |
18 | a minimum | | | | | | | 9 | 0.51% |
19 | initial curing | | | | | | | 8 | 0.45% |
20 | freshly mixed | | | | | | | 8 | 0.45% |
THREE WORD PHRASES 2221 Words
# |
Keyword |
H1 |
Title |
Des |
Volume |
Position |
Suggest |
Frequency |
Density |
1 | sample shall be | | | | | | | 8 | 0.36% |
2 | are to be | | | | | | | 7 | 0.32% |
3 | sides of the | | | | | | | 7 | 0.32% |
4 | temperature measuring device | | | | | | | 6 | 0.27% |
5 | × astm c172 | | | | | | | 6 | 0.27% |
6 | a minimum of | | | | | | | 6 | 0.27% |
7 | astm c172 section | | | | | | | 6 | 0.27% |
8 | freshly mixed concrete | | | | | | | 6 | 0.27% |
9 | the temperature measuring | | | | | | | 6 | 0.27% |
10 | the measuring bowl | | | | | | | 5 | 0.23% |
11 | rod each layer | | | | | | | 5 | 0.23% |
12 | specimens shall be | | | | | | | 5 | 0.23% |
13 | the initial curing | | | | | | | 4 | 0.18% |
14 | the surface and | | | | | | | 4 | 0.18% |
15 | times with the | | | | | | | 4 | 0.18% |
16 | of freshly mixed | | | | | | | 4 | 0.18% |
17 | the sample shall | | | | | | | 4 | 0.18% |
18 | concrete by the | | | | | | | 4 | 0.18% |
19 | the sides of | | | | | | | 4 | 0.18% |
20 | concrete testing adherence | | | | | | | 4 | 0.18% |
21 | of the batch | | | | | | | 4 | 0.18% |
22 | of the measure | | | | | | | 4 | 0.18% |
23 | the tamping rod | | | | | | | 4 | 0.18% |
24 | of the maximum | | | | | | | 3 | 0.14% |
25 | 150 mm × | | | | | | | 3 | 0.14% |
26 | 15 times with | | | | | | | 3 | 0.14% |
27 | to 15 times | | | | | | | 3 | 0.14% |
28 | during initial curing | | | | | | | 3 | 0.14% |
29 | 10 to 15 | | | | | | | 3 | 0.14% |
30 | placed on a | | | | | | | 3 | 0.14% |
FOUR WORD PHRASES 2378 Words
# |
Keyword |
H1 |
Title |
Des |
Volume |
Position |
Suggest |
Frequency |
Density |
1 | × astm c172 section | | | | | | | 6 | 0.25% |
2 | the temperature measuring device | | | | | | | 5 | 0.21% |
3 | the sample shall be | | | | | | | 4 | 0.17% |
4 | the sides of the | | | | | | | 4 | 0.17% |
5 | each layer 25 times | | | | | | | 3 | 0.13% |
6 | of the measuring bowl | | | | | | | 3 | 0.13% |
7 | 15 times with the | | | | | | | 3 | 0.13% |
8 | to 15 times with | | | | | | | 3 | 0.13% |
9 | 10 to 15 times | | | | | | | 3 | 0.13% |
10 | sample shall be obtained | | | | | | | 3 | 0.13% |
11 | test specimens shall be | | | | | | | 3 | 0.13% |
12 | be cast a minimum | | | | | | | 3 | 0.13% |
13 | tap the sides of | | | | | | | 3 | 0.13% |
14 | after each layer is | | | | | | | 3 | 0.13% |
15 | the measure to cover | | | | | | | 3 | 0.13% |
16 | the maximum and minimum | | | | | | | 3 | 0.13% |
17 | rod each layer 25 | | | | | | | 3 | 0.13% |
18 | maximum and minimum temperature | | | | | | | 3 | 0.13% |
19 | a minimum of 2 | | | | | | | 3 | 0.13% |
20 | remixed with a shovel | | | | | | | 3 | 0.13% |
21 | of the maximum and | | | | | | | 3 | 0.13% |
22 | by the pressure method | | | | | | | 2 | 0.08% |
23 | times with the mallet… | | | | | | | 2 | 0.08% |
24 | sample shall be taken | | | | | | | 2 | 0.08% |
25 | shall be taken between | | | | | | | 2 | 0.08% |
26 | the 10 and 90 | | | | | | | 2 | 0.08% |
27 | curing period shall be | | | | | | | 2 | 0.08% |
28 | initial curing period shall | | | | | | | 2 | 0.08% |
29 | taken between the 10 | | | | | | | 2 | 0.08% |
30 | between the 10 and | | | | | | | 2 | 0.08% |
31 | and 90 points of | | | | | | | 2 | 0.08% |
32 | 10 and 90 points | | | | | | | 2 | 0.08% |
33 | concrete by the pressure | | | | | | | 2 | 0.08% |
34 | be taken between the | | | | | | | 2 | 0.08% |
35 | advance it with a | | | | | | | 2 | 0.08% |
36 | minimum of 28 l | | | | | | | 2 | 0.08% |
37 | is found to be | | | | | | | 2 | 0.08% |
38 | and remixed with a | | | | | | | 2 | 0.08% |
39 | combined and remixed with | | | | | | | 2 | 0.08% |
40 | with a sawing motion | | | | | | | 2 | 0.08% |
EXTERNAL LINKS