1 | environmental impact assessment of | | | | | | | 16 | 0.88% |
2 | riverbed and right of | | | | | | | 8 | 0.44% |
3 | and right of way | | | | | | | 8 | 0.44% |
4 | basic and detailed design | | | | | | | 7 | 0.39% |
5 | right of way limit | | | | | | | 6 | 0.33% |
6 | engineering procurement and construction | | | | | | | 6 | 0.33% |
7 | detailed design studies of | | | | | | | 5 | 0.28% |
8 | and detailed design studies | | | | | | | 5 | 0.28% |
9 | environment environmental impact assessment | | | | | | | 5 | 0.28% |
10 | of way limit delineation | | | | | | | 5 | 0.28% |
11 | procurement and construction project | | | | | | | 4 | 0.22% |
12 | tudy on aquaculture in | | | | | | | 4 | 0.22% |
13 | projects in tehran khorasan | | | | | | | 4 | 0.22% |
14 | detailed design study of | | | | | | | 4 | 0.22% |
15 | irrigation and drainage basic | | | | | | | 4 | 0.22% |
16 | environment eia study of | | | | | | | 4 | 0.22% |
17 | study of water supply | | | | | | | 4 | 0.22% |
18 | study detailed design and | | | | | | | 4 | 0.22% |
19 | through engineering procurement and | | | | | | | 3 | 0.17% |
20 | irrigation and drainage network | | | | | | | 3 | 0.17% |
21 | impact assessment study of | | | | | | | 3 | 0.17% |
22 | study for construction of | | | | | | | 3 | 0.17% |
23 | engineering study for construction | | | | | | | 3 | 0.17% |
24 | drainage basic and detailed | | | | | | | 3 | 0.17% |
25 | basic study of water | | | | | | | 3 | 0.17% |
26 | of water supply and | | | | | | | 3 | 0.17% |
27 | of gomishan shrimp breeding | | | | | | | 3 | 0.17% |
28 | gomishan shrimp breeding complex | | | | | | | 3 | 0.17% |
29 | water quality modelling of | | | | | | | 3 | 0.17% |
30 | study of lake urmia | | | | | | | 3 | 0.17% |
31 | in tehran khorasan razavi | | | | | | | 3 | 0.17% |
32 | and construction supervision of | | | | | | | 3 | 0.17% |
33 | 5 projects in tehran | | | | | | | 3 | 0.17% |
34 | water conveyance canal of | | | | | | | 3 | 0.17% |
35 | way limit delineation of | | | | | | | 3 | 0.17% |
36 | supreme and construction supervision | | | | | | | 3 | 0.17% |
37 | hormozgan sistan and baluchestan | | | | | | | 3 | 0.17% |
38 | engineeing riverbed and right | | | | | | | 3 | 0.17% |
39 | study on construction of | | | | | | | 2 | 0.11% |
40 | dam in sari city | | | | | | | 2 | 0.11% |