1 | nigeria – 2018 engineering | | | | | | | 3 | 0.70% |
2 | study and concept development | | | | | | | 3 | 0.70% |
3 | operator in nigeria – | | | | | | | 3 | 0.70% |
4 | in nigeria – completed | | | | | | | 3 | 0.70% |
5 | 2018 engineering study for | | | | | | | 3 | 0.70% |
6 | – 2018 engineering study | | | | | | | 3 | 0.70% |
7 | supply of equipment and | | | | | | | 2 | 0.47% |
8 | ael energy services ael | | | | | | | 2 | 0.47% |
9 | nigeria – completed 2019 | | | | | | | 2 | 0.47% |
10 | commissioning documentation and procedures | | | | | | | 2 | 0.47% |
11 | power nigeria completed in | | | | | | | 2 | 0.47% |
12 | equipment and manpower for | | | | | | | 2 | 0.47% |
13 | of equipment and manpower | | | | | | | 2 | 0.47% |
14 | nigeria completed in 2015 | | | | | | | 2 | 0.47% |
15 | and manpower for the | | | | | | | 2 | 0.47% |
16 | alstom power nigeria completed | | | | | | | 2 | 0.47% |
17 | procurement and construction of | | | | | | | 2 | 0.47% |
18 | and construction of a | | | | | | | 2 | 0.47% |
19 | for alstom power nigeria | | | | | | | 2 | 0.47% |
20 | turbines for alstom power | | | | | | | 2 | 0.47% |
21 | field operator in nigeria | | | | | | | 2 | 0.47% |
22 | overhaul of gas fired | | | | | | | 2 | 0.47% |
23 | and concept development of | | | | | | | 2 | 0.47% |
24 | feasibility study and concept | | | | | | | 2 | 0.47% |
25 | project for a marginal | | | | | | | 2 | 0.47% |
26 | gas project for a | | | | | | | 2 | 0.47% |
27 | systems ael logistics services | | | | | | | 2 | 0.47% |
28 | in nigeria – 2018 | | | | | | | 2 | 0.47% |
29 | study for preparation of | | | | | | | 2 | 0.47% |
30 | african circle limited – | | | | | | | 2 | 0.47% |
31 | for african circle limited | | | | | | | 2 | 0.47% |
32 | documentation and procedures a | | | | | | | 2 | 0.47% |
33 | engineering study for preparation | | | | | | | 2 | 0.47% |
34 | – completed 2019 feasibility | | | | | | | 2 | 0.47% |
35 | station in nigeria – | | | | | | | 2 | 0.47% |
36 | distribution system for sow | | | | | | | 2 | 0.47% |
37 | and distribution system for | | | | | | | 2 | 0.47% |
38 | gas processing plant in | | | | | | | 2 | 0.47% |
39 | of commissioning documentation and | | | | | | | 1 | 0.23% |
40 | for preparation of commissioning | | | | | | | 1 | 0.23% |